INSTALLATION

 

Wall drilling and bracket fixing 

11

12a

12"5/8

X

÷1/16"

4"9/16

24"

7.2.1

4"9/16

 

Wall marking: 
•  Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the 

center of the area in which the hood will be installed. 

•  Draw a horizontal line at 24” above the hob. 
• Place bracket 7.2.1 on the wall as shown about 1/16” from the ceiling or upper limit aligning 

the center (notch) with the vertical reference line. 

•  Mark the wall at the centers of the holes in the bracket. 
•   Place bracket 7.2.1 on the wall as shown at X” below the first bracket (X = height of the up-

per chimney section supplied), aligning the center (notch) with the vertical line. 

•   Mark the wall at the centers of the holes in the bracket. 
•  Mark a reference point as indicated at 4” 9/16 from the vertical reference line and 13” 3/8 

above the horizontal reference line. 

•   Repeat this operation on the other side. 
•   Drill ø 5/16” holes at all the center points marked. 
•   Insert the wall plugs 11 in the holes. 
•   Fix the brackets using the 12a screws supplied. 
•  Insert the two screws 12a supplied in the hood body fixing holes, leaving a gap of  3/16 ” 