5 Performing setting of the production control information

@
– 106 
1
2
3
4
5
6
6
(5) Performing setting of the production control information
1)  Display the production control screen.
  Display the production control screen referring 
to 
"42.(4) Observing the production control 
information"
.
3)  Input the pitch time.
  Next, input the pitch time required for one 
process. When PITCH button 
4
 of the 
aforementioned item 1) is pressed, the pitch 
time input screen is displayed.
  Input the value you desire with ten keys or 
UP/DOWN buttons.
  After the input, press ENTER button 
6
.
2)  Input the final target value.
  First, input the number of pieces of the target 
of production in the process to which sewing 
is performed from now on. When final target 
value button 
  3
 is pressed, the final 
target value input screen is displayed.
  Input the value you desire with ten keys or UP/
DOWN buttons.
  After the input, press ENTER button 
6
.